Above Ceiling Work (ACW) Policy Term Definition


includes the inspection, repair and installation of pipes, conduits, ducts, cables, wires, pneumatic tubes, and similar building services which take place above existing ceiling levels. It does not include construction activities which occur before the permanent ceiling is installed in areas that are being renovated or in buildings under construction. In the latter cases the above ceiling final inspection addresses the issues covered by this Policy.