UTMB Campus Flood Mitigation Strategy UTMB Mechanical, Electrical, and Plumbing Elevations

To protect this critical facility's critical infrastructure, all the Mechanical, Electrical, and Plumbing (MEP) elements located in John Sealy Hospital and the Emergency Department building will be mitigated to a minimum of 22' MSL, as required by the UTMB Campus Flood Mitigation Strategy. The equipment that will be moved includes the chilled water system and controls, the heated water system and controls, normal and emergency power systems, fire alarm system, domestic water system, domestic hot water system, medical vacuum pump and air receiver and medical compressed air, water softener system, fire pump system, instrument air compressor system.

Review the UTMB Campus Flood Mitigation Strategy